Page 2

Page 3

Table of content

Photo By: Alvar Braathen

UNIS CO2 Lab - Adventdalen 2008

I.  Project History

• Introduction and Project History

  ....................................................  

page 4-5

2. 

Project Summary 

 

........................................................................  

page 6-8

3.  Status anno January 2015

 

..............................................................  

page 9

4. Health Safety and the Enviroment

• 

HSE Standards as originally defined by the Longyearbyen CO2 Lab in 2007

• 

Gas in wells and related HSE

• 

Chemicals and materials

• 

 

Status and securing

• HSE summary 

.......................................................................     

page10-19

5. Drilling operations 

...........................................................................     

page20-23

6. Well Operations 2007 - 2012

• 

Well Decription 

 

.....................................................................  

page 24-25

7.  Plugging and Abandonment (P&A) and related well tests.

• 

Wells Plugged 2013 

 

• 

Wells Plugged 2014

  

• 

Summary of P&A

  

.................................................................  

  page 26-35 

8.  Research

• 

Injection and Pressure Testing

• 

Seismics 

monitoring

 

• 

Modelling of the Longyearbyen CO2 sequestration site

• 

Geomechanical analyses

• 

Fracture systems in the subsurface of the Longyearbyen CO2 Lab

• Permeability of tight sandstones
• Leakage and permafrost
• Marine baseline study for the Longyearbyen CO2 Lab 
• Forecasting phase relations in the Longyearbyen CO2 lab reservoir 

   

.......  

page 27-61

9. 

International Journal Publications  (peer review journals) 

  ....................  

page 62-63

10. 

Education  

....................................................................................  

page 63-67

11. 

Abstracts & Conference Proceedings internationally recognised

  ..........  

page 68-70

12. 

Internatioal awareness  

...................................................................  

page 71

13. 

Outreach

  .....................................................................................  

page 72-73

14. 

Future Plans and Project Proposals

  ..................................................  

page 73-78

15. 

Appendix  

....................................................................................  

page 79-85